Which chip conveyor is right for long and short metal chips?
As of October 2026
Reading time: 4 minutes
In brief
Chip conveyor selection depends on more than the material and hourly throughput. The actual chip shape, brief peak loads and the entire conveying route are also decisive. A hinged belt conveyor may be a suitable starting point for long chips and tangled chip bundles. Short chips and sludge that settle readily can often be removed using a scraper conveyor. However, general guidance cannot replace an assessment using the actual material to be conveyed.
Why is chip shape so important when conveying metal chips?
A conveyor may appear suitable for a given material based on its data sheet, yet still become blocked during production. The reason often lies in the actual chip shape: short broken chips behave differently from long, tangled chips from turning operations. Selecting conveyor technology solely on the basis of material and hourly throughput can overlook the operating conditions that later cause stoppages.
A sample from the actual process is essential. Simply describing the material as “steel chips” is not enough. How long are the chips? Do they form tangled bundles? Does the material include fine particles or wet chips? Are different materials processed? System design must also account for brief peaks in chip throughput, for example after a tool change, and for the points where material is transferred or lifted. A photograph helps, but a representative material sample and information about the production cycle are even more useful.
Chip shape can also change within the same production process. A different tool, modified cutting parameters or a new material can alter the material being conveyed. The sample should therefore represent both normal operation and the most demanding known conditions. An average value in kilograms per hour alone says little about whether a tangled bundle of chips could block the inlet.
Hinged belt conveyor or scraper conveyor for metal chips?
A hinged belt conveyor may be a suitable starting point for long chips and tangled chip bundles. Short chips and sludge that settle readily can often be removed along a trough using a scraper conveyor. The chip conveyor overview also groups conveyor types by chip characteristics. However, manufacturer examples show that belt construction and discharge details are particularly important for sticky or heavily tangled chips. General guidance cannot replace testing with the actual material to be conveyed.
Hinged belt conveyor
Scraper conveyor
Typical conveyed material
Long chips and tangled chip bundles; depending on the design, short chips as well
Short chips and sludge that settle readily
Conveying principle
Material is carried on interconnected hinged plates
Flights push the material along a trough
What to check before selection
Infeed, chip entanglement, belt construction and discharge
Chip shape, settling behaviour and discharge
The table provides initial guidance. The appropriate design also depends on chip throughput, the metalworking fluid used and the conveying route.
Where can blockages occur during chip removal?
Three areas deserve particular attention during planning:
→
At the inlet: Tangled chip bundles arrive in bursts at an infeed area that is too small.
→
At bends and inclines: Long chips become entangled, or material falls back.
→
At the discharge point: The conveyor handles the throughput, but a hopper or container obstructs the discharge.
These points provide a planning checklist rather than a universal diagnosis of faults. The metalworking fluid is equally important. It should drain off at suitable points rather than leave the system uncontrolled with the chips. Depending on the process, subsequent chip separation, removal of residual fluid or transfer to a chip storage bunker may be appropriate.
A simple thought experiment helps during preliminary assessment: What happens if two machines discharge chips at the same time while material is already present at the collection point? This often highlights requirements for buffering, conveying speed and control. The entire route to the container must be assessed under the most demanding conditions, rather than considering only the conveyor section immediately in view.
What information is needed to specify a chip conveyor?
Useful information includes the workpiece material, a representative chip sample, chip shape, average throughput and peak loads, the type of metalworking fluid and the liquid content of the chips, and the number of machines.
Sketches should show the inlet, conveying route, height difference and discharge point. This information helps determine whether a single conveyor is sufficient or an interlinked conveyor system is required. The appropriate conveyor must be able to handle the most demanding actual operating conditions.
Frequently asked questions
Suitable solutions from KÖBO ECO>PROCESS
Conveyor technology
Hinged belt conveyor
View product →
Conveyor technology
Scraper conveyor
View product →
Conveyor technology
Chip storage bunker
View product →
KÖBO ECO>PROCESS technical editorial team
Questions about this article: Contact us
Contents
Why is chip shape so important when conveying metal chips?
Hinged belt conveyor or scraper conveyor for metal chips?
Where can blockages occur during chip removal?
What information is needed to specify a chip conveyor?
Frequently asked questions
Suitable solutions
Related Terms
Chip conveyor
Chip shape
Metal chips
Chip conveying
Chip disposal
Metalworking fluid
Peak load
Need help with system design?
We'll evaluate which solution is right for your process—with no obligation.
Send an enquiry